Logitech Engineering

Electrical and Automation Engineering - Since 2001

Power Conditioning

Power Factor Correction

Large Scale Power Factor Correction

Large scale power factor correction for large switching loads such as Arc Furnaces must be designed using Fourier Analysis tools, and tested on site to verify the operating constraints and effectiveness. Logitech Engineering, in partnership with Keech Furnace Technologies and EC&M, completed the installation of the Windimurra Vanadium Mine in WA which is the only DC Arc Furnace in the world operating from Gas Turbines not connected into the power grid.


Sizing of the 11kV power conditioning reactors and capacitor bank required specialized engineering tools and expertise including Fourier Analysis and MatLab.

Cable Raceway

Cable Raceway

Power System Cabling & Protection

Logitech Engineering use PowerCAD computer modelling software for all Low Voltage power systems. This program allows complex power systems to be modeled, including:

  • Fault Level Calculations
  • Maximum Demand
  • Time-Current Curves
  • Arc Fault Calculations
  • Voltage Drop
  • Circuit Breaker Sizing

This photo shows the power & control cabling from the Main Substation of a large LNG plant in Western Australia. Careful planning of the cable arrangement from end-to-end is critical with these complex multi-layer cable ladder designs.